Duration: 6 hours
6 modules
MODULE 1: ASSEMBLY PREPARATION FOR 90 DEGREE DRILLING PROJECT
MODULE 2: INSTALLING 5/16 INCH HI-LOKS
MODULE 3: INSTALLING 3/16 INCH HI-LOKS
MODULE 4: INSTALLING PROTRUDING HEAD RIVETS
MODULE 5: REMOVING RIVETS IN THE 90 DEGREE DRILLING PROJECT
MODULE 6: REMOVING 5/16 INCH HI-LOKS
Reviews
There are no reviews yet.